Our Work
Embassy Suites, La Jolla, CA:
Complete urethane coating redo of parking deck of concrete parking structure at the Embassy Suites in La Jolla, CA with BASF 200/275/295 deck coating system.
Complete urethane coating redo of parking deck of concrete parking structure at the Embassy Suites in La Jolla, CA with BASF 200/275/295 deck coating system.
1620 5th Ave, San Diego, CA:
Complete urethane coating redo of parking deck of concrete parking structure downtown San Diego with Sika 710/715 deck coating system and full broadcast.
Complete urethane coating redo of parking deck of concrete parking structure downtown San Diego with Sika 710/715 deck coating system and full broadcast.
Long Beach Browning High School, Long Beach, CA:
Installation of PROSOCO Cat5 air barrier system at brand new high school in the heart of Long Beach, approx. footage is 80,000 SF. TB Penick is the general contractor and Balfour Beatty Construction is the construction manager.
Installation of PROSOCO Cat5 air barrier system at brand new high school in the heart of Long Beach, approx. footage is 80,000 SF. TB Penick is the general contractor and Balfour Beatty Construction is the construction manager.
Carlsbad Safety Center, Carlsbad, CA:
Complete weatherproofing and resealing of Carlsbad Safety Center; including the cutting out of old reverted urethane and soft silicone joint sealant and installation of Sikasil 290/295 silicone sealant and cleaning and sealing of the concrete GFRC wall panels with Sikaguard 705.
Complete weatherproofing and resealing of Carlsbad Safety Center; including the cutting out of old reverted urethane and soft silicone joint sealant and installation of Sikasil 290/295 silicone sealant and cleaning and sealing of the concrete GFRC wall panels with Sikaguard 705.
Marina Park, Newport Beach, CA:
Complete waterproofing of elevator pit with Grace PrePrufe 300R and Bituthene 3000; waterproofing of concrete site walls with Tremco 250GC; and fluid-applied Vulkem 360/951NF urethane traffic coating at the large observatory deck looking over the marina.
Complete waterproofing of elevator pit with Grace PrePrufe 300R and Bituthene 3000; waterproofing of concrete site walls with Tremco 250GC; and fluid-applied Vulkem 360/951NF urethane traffic coating at the large observatory deck looking over the marina.
Executive Drive Waterproofing Removal, La Jolla, CA:
Removal of 6,000 SF of old hot fluid-applied asphatic waterproofing membrane. Removal consisted of mechanically scraping and grinding of the concrete walls to prepare a clean substrate for elastomeric paint.
Removal of 6,000 SF of old hot fluid-applied asphatic waterproofing membrane. Removal consisted of mechanically scraping and grinding of the concrete walls to prepare a clean substrate for elastomeric paint.
939 Coast Blvd. Pool Deck, La Jolla, CA:
Removal of old hot tar waterproofing and protection board then installation of Tremco 250GC cold fluid-applied waterproofing and J-Drain ThinDrain drainage panel over large concrete pool deck and common area.
Removal of old hot tar waterproofing and protection board then installation of Tremco 250GC cold fluid-applied waterproofing and J-Drain ThinDrain drainage panel over large concrete pool deck and common area.
Bob Hope Airport - Hangar 40 Epoxy Flooring, Burbank, CA:
Arizona Polymers Epoxy flooring system over 21,000 SF of hangar floor at Bob Hope Airport.
Arizona Polymers Epoxy flooring system over 21,000 SF of hangar floor at Bob Hope Airport.